Quality · Process yield

First-pass and rolled yield calculator

Enter first-pass counts for up to three serial steps. The calculator separates each step's FPY from final-good yield.

Step counts and flow assumptions

Step 1

Exclude rework, reruns, retests, returns, and offline repair.

Step 2 (optional)

Exclude rework, reruns, retests, returns, and offline repair.

Step 3 (optional)

Exclude rework, reruns, retests, returns, and offline repair.

Cohort and final-good checks
Does a common comparable population/model basis support multiplying these serial step yields?
Is final good from the same initial cohort after completed routing, with no outside additions?

Can include successful rework. Shown as final yield only when both cohort checks are confirmed.

Yield estimates

Enter at least one complete process step to calculate yield.

Formula, assumptions, and example

Definitions

For each step, FPY = units passing that step on the first attempt ÷ units entering that step. Exclude units scrapped, rerun, retested, returned, or diverted to offline repair from first-pass-good counts. This is the unit-count FPY convention described by the ASQ glossary (see references).

Rolled first-pass yield estimate = the product of the entered step FPYs. It is a count-based serial-process estimate. ASQ distinguishes unit-based total process yield from defect-based Poisson RTY. This page names its calculation method. It treats the models as different.

Worked example

Step FPYs are 98/100 = 0.98, 95/100 = 0.95, and 99/100 = 0.99. Their product is 0.98 × 0.95 × 0.99 = 0.92169, or 92.169% (92.17% displayed). The three 100-unit denominators illustrate rate arithmetic; they do not reconcile a pass-only cohort across steps. Only under a separately confirmed common-population model would 92.169 be a modeled expected no-rework count, not an observed whole-unit count.

Flow and final yield

Comparable serial routing is needed to interpret the product as a rolled estimate. Multiplying marginal rates does not by itself prove the observed fraction of a single cohort that passed every step; it assumes suitable common-population/representativeness conditions. Different row counts can indicate unrelated batches, split/merge routing, or rework loops.

Final-good yield is shown only when the entered final-good count is explicitly confirmed as the same initial cohort after completed routing with no outside additions. It is final good ÷ initial input and can include successful rework; it is not RTY. A missing or unconfirmed final count is suppressed.

Scope

The modeled no-rework count is initial input × product of step FPYs and appears only after confirming a comparable common flow. It is an expected model value and may be fractional. This calculator does not model parallel branches, split/merge routing, loops, or capability; see the ASQ references for the source definitions and model distinction.

References · checked 2026-10-11