Tools · OEE calculator

OEE calculator

Overall Equipment Effectiveness for one shift: Availability, Performance and Quality, and where the time was lost.

Shift data

Shift time

Full shift window

e.g. meal break — not setup or breakdowns

Production stops

Setup, changeovers, breakdowns and other stops

Speed and output

Fastest repeatable time for one part

Not good first time, including rework

Results

OEE time-loss waterfall A chart from planned production time through availability, performance, and quality losses to fully productive time.
    Minutes, same shift window as the inputs.

    85% is a commonly cited world-class benchmark. Treat it as a reference point, not a universal target. The definitions used for planned time and ideal speed should be consistent when you compare results. Benchmark context (checked 2026-10-08).

    How the calculation works

    Planned production time is the shift length minus only the periods when production was not scheduled. Run time is planned production time minus production stops. Include setup/changeovers, breakdowns, and other interruptions that happen within scheduled production; exclude only time when production was not scheduled, such as lunch.

    • Availability = Run time ÷ Planned production time
    • Performance = Ideal production time for total count ÷ Run time, where Ideal production time (minutes) = Ideal cycle time (seconds per part) × Total count ÷ 60
    • Quality = Good parts ÷ Total count
    • OEE = Availability × Performance × Quality
    • Availability loss = Production stop time, including setup/changeovers and breakdowns
    • Performance loss (minutes) = Run time − (Ideal cycle time (seconds per part) × Total count ÷ 60)
    • Quality loss (minutes) = Ideal cycle time (seconds per part) × Reject count ÷ 60
    • Fully productive time (minutes) = Ideal cycle time (seconds per part) × Good parts ÷ 60

    Cycle time and rate are two ways to describe ideal speed: Ideal cycle time (seconds per part) = 60 ÷ Ideal rate (parts per minute). If Performance is above 100%, check that ideal speed, time window, and count use matching units. The calculator warns and shows the calculated value without silently capping it.

    Changeover example. For a 480-minute shift, exclude a 30-minute lunch, then record a 30-minute changeover and a 20-minute breakdown as production stops. Planned production time is 450 minutes and run time is 400 minutes. With a 2-second ideal cycle, 12,000 parts and 120 rejects (11,880 good parts), Availability is 88.89%, Performance 100%, Quality 99%, and OEE is 88%. The good parts represent 396 fully productive minutes, so OEE is 396 ÷ 450 = 88%. If changeover is incorrectly treated as nonproduction time, planned time falls to 420 minutes and OEE reads 94.29%.

    Formula notes · checked 2026-10-09

    • OEE calculation definitions — factor equations, the preferred Availability × Performance × Quality calculation, and the guidance to check ideal cycle time when Performance exceeds 100%.
    • OEE glossary — time when production is not scheduled is outside planned production time; production stops during scheduled time, including changeovers, belong in Availability loss.
    • World-class OEE context — 85% is often referred to as world-class, while no single ideal score applies to every company.